Vessel
GENMAR VICTORY
Crude oil carrier (VLCC) · 314,500 DWT CLASS CRUDE OIL CARRIER
The ship this whole site is built around. Everything on this page was read off the GENMAR VICTORY's own Fire Control Plan and GA Plan — not from a general vessel database.
- Ship type
- Crude oil carrier (VLCC)
- Size class
- 314,500 DWT CLASS CRUDE OIL CARRIER
- Builder
- Hyundai (HHI)
- Hull numbers
- 1250 / 1251
- Manager
- Northern Marine Management Ltd.
- Classification society
- ABS (American Bureau of Shipping) — Fire Control Plan reviewed to resolution A.654
- Fire Control Plan drawn by
- Diversified Naval Architects Inc.
Principal particulars
| Item | Symbol | Value |
|---|---|---|
| Length overall | LOA | 333.49 m |
| Length between perpendiculars | LBP | 320.00 m |
| Breadth (moulded) | B | 70.00 m |
| Depth (moulded) | D | 25.60 m |
| Draft (moulded) | T | 16.76 m |
| Deadweight class | DWT | 314,500 t |
Source of these figures: Fire Control Plan — GENERAL PARTICULARS block
Ship profile and life-saving equipment positions
A hand-drawn 2D side profile at the hull's real proportions — 333.49 m length overall × 25.60 m moulded depth. Bow to the right; stern and accommodation to the left.
Marker positions are an approximation for learning — this is not an operational drawing.
Hover or tab to a gold marker for its name and quantity; activate it to open that equipment page.
Equipment marked on the profile
All 10 decks
As recorded in the Fire Control Plan, listed from the topmost deck down. The number counts up from the lowest level.
- 10Navigation DeckIn the planRocket parachute flares, EPIRB, SART, portable radios stowed on/near bridge (SOLAS III/6.3)
- 094th Poop DeckIn the plan
- 083rd Poop DeckIn the plan
- 072nd Poop DeckIn the plan
- 061st Poop DeckIn the plan
- 05Upper DeckIn the planMain cargo deck; lifebuoys, line-throwing appliance, embarkation arrangements
- 042nd DeckIn the plan
- 033rd DeckIn the plan
- 024th DeckIn the plan
- 01FloorIn the plan
SOLAS regulations that apply to this ship
Ship type under SOLAS: cargo ship
SOLAS Ch.III Part B Section I (reg. 6-20) + Section III (reg. 31-33) apply. As a tanker >20,000 GT, reg. 31.1.5 / free-fall or davit-launched lifeboat arrangements and reg. 16.6 apply.
| Regulation | Title | Located in |
|---|---|---|
| III/6 | Communications | Part B · Section I |
| III/7 | Personal life-saving appliances | Part B · Section I |
| III/8 | Muster list and emergency instructions | Part B · Section I |
| III/9 | Operating instructions | Part B · Section I |
| III/10 | Manning of survival craft and supervision | Part B · Section I |
| III/11 | Survival craft muster and embarkation arrangements | Part B · Section I |
| III/12 | Launching stations | Part B · Section I |
| III/13 | Stowage of survival craft | Part B · Section I |
| III/14 | Stowage of rescue boats | Part B · Section I |
| III/15 | Stowage of marine evacuation systems | Part B · Section I |
| III/16 | Survival craft launching and recovery arrangements | Part B · Section I |
| III/17 | Rescue boat embarkation, launching and recovery arrangements | Part B · Section I |
| III/17-1 | Recovery of persons from the water | Part B · Section I |
| III/18 | Line-throwing appliances | Part B · Section I |
| III/19 | Emergency training and drills | Part B · Section I |
| III/20 | Operational readiness, maintenance and inspections | Part B · Section I |
| III/31 | Survival craft and rescue boats | Part B · Section III |
| III/32 | Personal life-saving appliances | Part B · Section III |
| III/33 | Survival craft embarkation and launching arrangements | Part B · Section III |
| III/34 | [untitled] | Part B · Section IV |
| III/35 | Training manual and on-board training aids | Part B · Section V |
| III/36 | Instructions for on-board maintenance | Part B · Section V |
| III/37 | Muster list and emergency instructions | Part B · Section V |
Ship plans
Reduced views of the original drawings this site was sourced from. Open one full-screen to zoom into the detail.
GENERAL ARRANGEMENT OF ELECTRIC EQUIPMENT ON DECK
Drawing no. 2E-7000-304 · Sheet 10/10
Views in this drawing: Profile, Upper Deck, Tank Plan, Midship Section
This is the electrical-equipment GA. It marks LSA-related lighting: lifeboat/rescue boat/liferaft preparation and launching lights, emergency versions of each, and the emergency pushbutton for the lifeboat davit. Useful for locating the lifeboat, rescue boat and liferaft stations, not a full LSA arrangement plan.
FIRE CONTROL PLAN
Views in this drawing: Profile, Midship Section, Tank Plan, Upper Deck, 1st-4th Poop Deck, Nav Deck, 2nd-4th Deck, Floor
Carries the FIRE & LIFESAVING EQUIPMENT LEGEND with per-item quantities and deck symbols. This is the primary source for LSA positions on board.